Check BMW M5 2022 for free

BMW M5 2022 Black Automatic 4.4 L WBS83CH05NCH59356

  • request_quote

    $24 500

    Last Bid

WBS83CH05NCH59356# 1
WBS83CH05NCH59356# 2
WBS83CH05NCH59356# 3
WBS83CH05NCH59356# 4
WBS83CH05NCH59356# 5
WBS83CH05NCH59356# 6
WBS83CH05NCH59356# 7
WBS83CH05NCH59356# 8
WBS83CH05NCH59356# 9
WBS83CH05NCH59356# 10
WBS83CH05NCH59356# 11
WBS83CH05NCH59356# 12
WBS83CH05NCH59356# 13

vehicle information

  • Auction Copart Auto Auction Copart Auto Auction
  • Lot Number90437585
  • Prebid24 500 $
  • Date Sale23.12.2025
  • StatusSold
  • Date Updated23.12.2025
  • VINWBS83CH05NCH59356
  • Year2022
  • ConditionRun & Drive Verified
  • Mileage48 898 km
  • TransmissionAutomatic

vehicle overview

As a lot of people know, there are many used and new vehicle auctions in the United States of America. Recently the Copart auction site sold a 2022 BMW M5 with a 4.4L engine. The car was up for sale with minor damage which you can see in the photos. To make everything clear we post the vincode of the car WBS83CH05NCH59356. Buying an auto from the Copart auction site is a very profitable choice, because you can win a vehicle for 45% of its price, thereby save your money and take good car if you wish. This car is a excellent example of a similar solution, because after minor repairs you can drive a good car at a reduced price. If you think to buy amazing vehicle from United States of America then most likely you can think about to make an analysis of the available options and understand for what price they are sold and in what condition. You can check it at our website because not a lot of companies who give full information so clear and transparent without hide payments. For you we made search for a car by vincode number on the site, as well as select a specific make and model to accurately check for the vehicle you need. Now we will teach you ahot to analyze safe car at the Copart. First of all, you need to check auto pictures rigth conscientiously and assess the damage to the car. Read the annotation, form of damage, car odometer and compare them with the vehicle photos. Check the paintwork, the condition of the roof, marks from the auction staff and the general condition of the car. If vehicle has a lot of damage then we recommend that you contact the experts so that they check the damage and say you the real estimated cost and time of vehicle repair. We propose that you choose car with small damage resulting from minor accidents or weather conditions, as in this case your car will be amazing.

related this vehicle